Search

Your search for "" found 5737 Hits

Issue 6/2021 VECOPLAN AG

A processing line for flexible production of refuse-derived fuels in different qualities – a case study of Helmut Westarp

For its customer Westarp in Aschaffenburg, Vecoplan implemented an efficient, flexible processing line for a wide range of high-quality refuse-derived fuels. In order to avoid interfaces and minimise...

more
Issue 6/2021

Dear Readers,

Climate protection, yes, but who, why and how much – these are the exciting questions that no one is daring to tackle right now. You can read interesting thoughts on this subject in our column on page ...

more
Issue 6/2021 BEUMER GROUP

Beumer Group expands in the USA

In addition to the existing office in Somerset, New York, the Beumer Group has now opened a new office in Denver, Colorado. This merged the offices in Kansas City and Dallas. The new location in...

more
Issue 6/2021 TITAN CEMENT GROUP

Creating the smart cement plant of the future

Titan is creating the smart cement plant of the future with a multitude of cutting-edge solutions leveraging the power of Artificial Intelligence (AI), in the context of the Group’s digital...

more
Issue 6/2021 NATIONAL COUNCIL FOR CEMENT AND BUILDING MATERIALS (NCCBM)

New Chairman and Vice-Chairman of NCCBM appointed

The Board of Governors of the National Council for Cement and Building Materials (NCCBM), an autonomous R&D organization under the administrative control of the Ministry of Commerce and Industry,...

more
Issue 6/2021 WO 2021/125979 A1

Cement additive

(22) 16.12.2020(43) 24.06.2021(57) The invention provides cement additives comprising calcium sulfate and silica which are derived from a material comprising perovskite and silica, along with cements...

more
Issue 6/2021 WO 2021/124261 A1

Method of producing cement clinker and a second calcined material

(22) 18.12.2020(43) 24.06.2021(57) A method of producing cement clinker and a second calcined material, wherein the cement clinker is produced in a first production line and the second calcined...

more
Issue 6/2021 WO 2021/124231 A1

Method of processing exhaust gas

(22) 18.12.2020(43) 24.06.2021(57) In a method of processing exhaust gas containing CO2, such as exhaust gas from a cement production plant, the following steps are carried out: – burning fuel in the...

more
Issue 6/2021 WO 2021/120705 A1

Method for preparing α-hemihydrate gypsum

(22) 07.09.2020(43) 24.06.2021(57) Disclosed is a method for preparing α-hemihydrate gypsum, the method involving using citric acid as a crystal transformation agent to prepare dihydrate gypsum, and...

more
Issue 6/2021 WO 2021/113737 A1

Phlego cement from a new earth-inspired clinker

(22) 04.12.2020(43) 10.06.2021(57) Improved cement for concrete is provided having reduced carbon footprint and improved mechanical properties. A limestone-free process of making the clinker provides...

more

Ihre Suche nach "" :

5920 Treffer in "AT Minerals"

10788 Treffer in "Bundesbaublatt"

8021 Treffer in "Betonwerk + Fertigteil-Technik"

7305 Treffer in "bauhandwerk"

1198 Treffer in "Brandschutz"

1092 Treffer in "Computer Spezial"

4926 Treffer in "dach+holzbau"

17813 Treffer in "Deutsche BauZeitschrift"

6731 Treffer in "FACILITY MANAGEMENT"

12368 Treffer in "Kälte Klima Aktuell"

6269 Treffer in "metallbau"

1333 Treffer in "recovery"

12636 Treffer in "SHK Profi"

17184 Treffer in "tab - Das Fachmedium der TGA-Branche"

12329 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

1944 Treffer in "tunnel"

5737 Treffer in "Zement Kalk Gips"

3532 Treffer in "Ziegelindustrie International"