ES2903251 (A1)

Control of volatiles in cement clinker manufacturing processes (cold bypass)

(22) 30.09.2020

(43) 31.03.2022

(57) Reduction of volatile emission during direct progress in cement clinker manufacturing processes, by removing or purging the volatile contents in gaseous currents (excess of the heat exchange tower that is not needed in the mills crude in the case of existing 2 crude mills) or adsorbed in solid currents (CKD of the heated line end-sleeved filter to evaporate the volatile adsorbed on it), managing to take a portion of volatiles, from the recirculation process of cement processes: adsorption of volatiles in crude oil (produced in the crude mill when the gases loaded by volatiles are mixed intimately with the raw material that is milled) and subsequent volatilization (when the volatiles captured by the ground crude are mixed intimately with hot gases from the oven).

(71) Cogcem Proyectos, S.L. (ES)

x

Related articles:

Issue 4/2021 ES2812673 (A1)

Biomass boiler integration system in cement clinker manufacturing processes

(22) 26.12.2018 (43) 17.03.2021 (57) It involves integrating the gas streams of an electric power generation plant in a different way, using a biomass boiler, with the gas streams of the facilities of...

more
Issue 2/2023 WO 2022/261686 A1

Cement clinker installation and process for depositing a volatile component

(22) 14.06.2022 (43) 22.12.2022 (57) The invention relates to an installation, in particular a cement clinker installation (1), and to a method for depositing a volatile component, in particular...

more
Issue 10/2018 US 2018/0194680 A1

Process and device for separating off a volatile component

(22) 05.03.2018 (43) 12.07.2018 (57) A process and device separate off a volatile component from the off-gases in cement clinker production. Raw materials for cement clinker production are passed...

more
Issue 02/2024 WO2024008633 A1

Method for manufacturing cement clinker

(22) 03.07.2023 (43) 11.01.2024 (57) Method for manufacturing cement clinker comprising the steps: providing a raw meal; preheating the raw meal in a preheater (1); calcining the preheated raw meal in...

more
Issue 10/2015 US 2015/0225292 A1

Process and device for separating off a volatile component

(22) 02.09.2013 (43) 13.08.2015 (57) A process and device separate off a volatile component from the off-gases in cement clinker production. Raw materials for cement clinker production are passed...

more