AERZENER MASCHINENFABRIK GMBH

Improving the coal-feeding conveying system in a Holcim cement plant

Aerzen has improved the pneumatic conveying coal feeding system to the main burner at the Holcim Colombia plant. The plant is located in Nobsa, a small town 2.5 h away from Bogotá. The plant capacity is about 3Mt/year of cement and has a market share in Colombia of 12 %, with high growth expectations following the establishment of the Lafarge Holcim joint venture in 2015.

In 2014, Aerzen USA optimised the pneumatic coal-conveying transport to the main burner, also known as the Pfister system. In this application, two Aerzen GM 35S tri-lobe blowers from the 1990s were in operation. Each machine operated at an intake volume flow of 37.4 m³/min, differential pressure of 600 mbar and with a 75 kW (100 HP) electric motor. The noise generated was calculated at 102 dB as the machines did not have acoustic hoods (local Colombian regulations define 80 dB as the maximum allowed noise level). Power consumption demand for the system was measured at an average of 54 kW per machine, which represented an annual energy cost of US$ 78000 (considering a kW cost of 0.1 USD$ and 20000 h MTBR – Mean Time Between Repairs).

At Holcim Colombia, each production area is independent in its operation. This makes upgrading projects for specific applications easier. At Holcim, the corporate policy says that every kW counts.

//www.aerzen.com" target="_blank" >www.aerzen.com:www.aerzen.com

x

Related articles:

Issue 04/2011

Feeding equipment for a modern dry kiln line

In spring 2008, the Lafarge Wössingen Zement plant (Fig. 1) in Germany began the conversion of its production process from the semi-wet to the energy-saving dry process [1-5]. The project was...

more
Issue 1-2/2016 FLSMIDTH PFISTER GMBH

Coal dust dosing without compromises

Introduction An output of more than 6000 t/d of grey Portland Cement makes the Ain Sokhna plant one of the main players in the region. The complete package of FLSmidth machinery included an EV...

more
Issue 12/2015 THYSSENKRUPP INDUSTRIAL SOLUTIONS

ThyssenKrupp receives order to build cement plant in Colombia

ThyssenKrupp Industrial Solutions, the plant engineering and construction specialist of the ThyssenKrupp Group, has received an order to build a cement clinker production line from Cem­entos Argos,...

more
Issue 1-2/2017

FLSmidth receives cement plant order in Colombia

FLSmidth has obtained an order from OHL Industrial for engineering, procurement and supply of equipment for a complete cement production line with a capacity of 3150 t/d. The plant will be located in...

more
Issue 1/2023 INTERCEM ENGINEERING GMBH | SOLNHOFER PORTLAND-ZEMENTWERKE GMBH & CO. KG

Truck receiving station and dosing for substitute fuels for the rotary kiln in the Solnhofen Portland cement plant

At the Portland cement plant in Solnhofen the dosing equipment, the steel construction, the platforms and the conveying lines were renewed, the silos were lined with stainless steel and the pneumatic...

more