Dip tube cast lining system in Germany
Korfez Eng. has received an order from a globally positioned building materials group in Germany for a dip tube cast lining system for its pre-heater, cyclone stage 2. The dip tubes will be executed as a locked hanging segment system tailor-fit to the existing dip tube. In close collaboration with the customer, the company determined the optimum material alloy for this application which is being used for the first time. Manufacturing will be completed in about two months and delivery is planned for April 2015.
//www.korfez-eng.de" target="_blank" >www.korfez-eng.de:www.korfez-eng.de