Dustproof conveying of alternative fuels
The HOLCIM Bulgaria cement plant in Béli Izvor (Fig. 1) has installed 4 conveyor belts 800 mm wide, and with a total length of 210 m, designed and delivered by STANDARD INDUSTRIE. HOLCIM are very satisfied with the installation and the following year placed a new order for a plant of the same size to be installed in 2009 in Romania.
1 Alternative fuel feeding
The complete installation has been designed to feed the kiln in the cement plant with alternative fuels (shredded tyres, rags soaked in hydrocarbons, wood chips etc.). The 4 conveyors are located on a self-supporting chassis with an...