At Märker Zement in Lauffen, the chain guide rails in the portal scraper for slag sand had only ever lasted six months. Considerable costs were incurred for plant downtime during the season and the replacement of the chain guide rails. Uwe Fabich, Operations Manager at Märker-Werke Lauffen and Harburg, was looking for a solution for trouble-free operation during the season and a longer lifetime for the chain guide rails.

At its sites in Harburg and Lauffen, Märker Zement produces Portland, Portland slag and Portland composite cements, blast furnace cements and cements for special applications, e.g. road surfacing cement, sulphate-resistant blast furnace cement, cement for concrete with high early strength for the prefabricated element sector, or hydraulic base course binder.

FB Ketten has been supplying customer-specific chain solutions for almost 30 years. The main objective is always a notable cost reduction, longer lifecycle, less downtime and increased operational reliability for the plant operator. Uwe...

Related articles:

Issue 4/2021 BEUMER GROUP GMBH & CO. KG

Beumer provides Märker Zement with single-source solution for alternative fuels

In production, Märker Zement GmbH relies on alternative fuels (AFR). The manu-facturer has therefore commissioned Beumer Group with the supply of a single-source solution that is able to convey and...

more
FB KETTEN | Powtech 2019 | 2.120

Optimised chain solutions

FB Ketten will be showing a number of products which have been developed especially for bulk handling. One of which is FB rEVOLUTION scraper chains. These combine the wear resistance of drop forged...

more
Issue 7/2023 GEDA GMBH

A decade of Märker and Geda

Having worked together for many years, construction and industrial lift manufacturer Geda GmbH and Märker Zement GmbH are continuing their partnership. Geda has enjoyed an impressive track record...

more
Issue 1-2/2016 FB KETTEN

Overhauling a plate conveyor

1 Introduction FB Ketten has realized a customized and low-cost solution for the replacement of a more than 50-year-old Beumer plate conveyor at Juracime, a cement producer in Switzerland. Juracime,...

more
Issue 01/2012

Difficult, but achievable: Bucket-elevator rebuild at Maerker Harburg

After only ten working days the bucket-elevator on the No. 8 cement mill at Märker Zement in Harburg/­Germany was recommissioned (Fig. 1). Despite difficult space constraints the rebuild was...

more