VRM to Azerbaijan
Beijing Triumph Building Materials Engineering Co., Ltd. belonging to the Chinese CNBM Group and acting as General Contractor for a new cement production line awarded Gebr. Pfeiffer a contract to supply an MPS 5300 B vertical roller mill for raw material grinding. The grinding plant will be installed in a new 5000-t/d cement production line of Qizildas cement works owned by the Azerbaijani company Norm LLC. The MPS raw mill ordered is designed to achieve a capacity of 450 t/h. Apart from the supply of the core components for the grinding plant, Gebr. Pfeiffer will supply workshop drawings to enable mill components to be manufactured locally and supervise their manufacture at Chinese workshops. Moreover, erection and commissioning on site will be monitored by Pfeiffer staff. The mill is scheduled to be delivered in the 3rd quarter of 2012.