First MVR mill
for the Iranian market
In September 2016, Gebr. Pfeiffer SE won a contract for the supply of a raw mill of the type MVR 4250 R-4, which will be set up at Biarjaimand Cement Company’s cement works in Iran.
The raw mill, having an installed drive power of 3000 kW, is designed to grind 280 t/h of cement raw material to a product fineness of ≤ 12 % R 90 µm.
The order was placed through the Chinese General Contractor Beijing Kaysun Trading, a subsidiary of Catic headquartered in Beijing. Gebr. Pfeiffer SE’s skilled staff will also supervise erection and commissioning.
The delivery of the equipment is slated to start in the second half of 2017.
//www.gebr-pfeiffer.com" target="_blank" >www.gebr-pfeiffer.com:www.gebr-pfeiffer.com